Port of Cotonou (Bénin) : extension of west breakwater

The autonomous port of COTONOU decided the construction of an extension of the West breakwater and has awarded the construction to the consortium. This project is a continuation of the extension of the sand retaining groyne in 2010 in order to contribute to the development of the Port of Cotonou. The main objectives are to develop and improve port facilities.

3.372, 2.326

Special features of the project

The extension of the west breakwater is protected with a single layer of ACCROPODE™ II amour units. Two ACCROPODE™ II sizes are used to protect this structure: 3m3 and 4m3 The breakwater is protected with 2700No ACCROPODE™ II units.

Hydraulic conditions

  • Length of structure: 200m
  • Max. water depth : 10m
  • Design wave Hs: 3.9 m
  • Wave period Tp: 17 s
  • 3D model test were carried out by ARTELIA laboratory

Construction aspect

  • 16 ACCROPODE™ II moulds of 3m3
  • 5 ACCROPODE™ II moulds of 4m3
  • Up to 15 lines in the slope 5 site visits contractual performed by CLI at the important stages of the armour construction
Country
Benin
Owner
Port autonome de Cotonou
Company
Consortium SOGEA SATOM & Dredging international
Designer
Artelia E&E
Date
2013 - 2017
Role of CLI
Sublicense contract and technical assistance for ACCROPODE™ II units