Hong Kong International Airport three runway system ACCROPODE™ project - China

As the CLIENT along with the contractor wanted to make sure that the armour units were all placed according to the technology standard; the contractor carried out the armour layer photogrammetry, so that CLI implemented the COMPLIANCE CERTIFICATE PROCEDURE as the ACCROPODETM I units were being installed. This data was used to provide a dense geo-referenced cloud of points, which was analysed by CLI expert as it progressed.