Llana beach réhabilitation
The LLana Beach Rehabilitation project includes the construction of two groynes to protect a sand beach in front of the Llana Beach Hotel on the west coast of Sal Island. The two groynes are rubble mound breakwater partially protected by ACCROPODE™ blocks.
The added value of CLI 
              In this project, CLI was involved as the ACCROPODE™ technology provider. CLI provided technical assistance for the provision of the placing plans, advice on best practices. CLI also provided onsite technical assistance.
Hydraulic conditions
- Water depth: -5 m
- Length of the structure: 2 x 150 m
- Crest level of the structure: +4 m
Construction aspect
- Number of units: 1500
- Size of units: 2m3
- Slope : H4/V3
Country 
              Cape Verde
          Owner 
              LLANA BEACH HOTEL de THE RESORT GROUP PLC
          Company 
              CONSTRUCTORA SAN JOSE S.A
          Designer 
              WW CONSULTORES DE HIDRAULICA E OBRAS MARITIMAS S.A.
          Date 
        
          
        
            2015
    
        
          
      You have a question ?
Specify your request ?
 
     
   
 
 
 
