Protection of the HKBCF artificial island with 0.8m3 ACCROPODE™ units dedicated to the new border crossing facilities between Hong-Kong – Zhuhai – and Macau.

The northern part of the island which is the most exposed, is now protected by more than 16 000 ACCROPODE™ units. All of the ACCROPODE™ units were placed below the sea level.

22.32, 113.95

The added value of CLI

CLI showed understanding of the Contractor’s needs. Problems solving mindset applied to this specific project.

 

Special features of the project

The ACCROPODE™ blocks were fabricated in China and shipped over the Pearl River to Hong-Kong. They were all placed underwater on a slope 2/1 with a maximum depth of 12 m.

Hydraulic conditions

  • Depth of the structure -12m
  • Length of the structure : 1.5 km
  • The project has been developped by CHEC and tested in a physical modeling test performed in NHRI.

Construction aspect

  • Number of units: 16 000 units
  • Size of units: 0.8 m3
Country
Hong Kong SAR China
Owner
The Government of Hong Kong Special Administrative Region Highways Department
Company
CHEC
Designer
CHEC - ARUP
Date
2015 - 2019
Role of CLI
Sublicense contract and technical assistance for ACCROPODE™ units