Construction of the fishing harbour of Chernomoretz in Bulgaria

CONSORTIUM CHERNOMORETZ ENGINEERING DZZD was awarded the construction of Chernomoretz fishing harbour located in the Black sea, 20 km East of BOURGAS (Bulgaria).

42.45, 27.638

The added value of CLI

The positioning was performed with GPS and divers supervision from June 2015 to November 2015.

Special features of the project

The placement of units was performed with placing drawings provided by CLI.

Hydraulic conditions

  •  Length of ACCROPODETM armouring: 270 m
  • Max. seabed depth: -9.35 m
  • Top of the crest: +3.52 m
  • Design wave Hs: 4.55 m

Construction aspect

  • The ACCROPODETM units had been cast in Contractor casting yard near the site.
  • ACCROPODETM II size: 2.0 m3 & 3.0 m3
  • 2 343 ACCROPODETM units in total
  • Concrete quantity: 5 001 m3
    The placing of the units had been performed according to placing drawings provided by CLI. The positioning has been performed with GPS under divers’ attendance
Country
Bulgaria
Owner
Municipalité de Sozopo
Company
CONSORTIUM CHERNOMORETZ ENGINEERING DZZD
Designer
BOURGAS I.R.S
Date
2015