Garachico

The project involves constructing a protective structure along the coast road near the village of Garachico in the north-western part of the island of Tenerife. The 300 m long structure is protected by a facing of 18 m3 ACCROPODE® blocks and 5.7 m3 ECOPODE® blocks on the upper berm.

28.372174, -16.765206

The added value of CLI

This project was the first time the ECOPODE® technique had been used, as the client laid great emphasis on reducing the visual impact of this coastal protection structure on the surrounding environment.

Special features of the project

Sogreah provided technical assistance to the contractor during the works, including the following:

  • Provision of technical information required for the successful completion of the structure.
  • Technical assistance on site with casting and placing the ACCROPODE® blocks. This involved 8 site visits.
  • Supply of positioning drawings for the ACCROPODE® armour.

Sogreah provided the contractor with 8 ECOPODE® forms required for casting the blocks, as well as specific technical assistance in implementing this new technique.

Key figures

  • 5.7 m3 ECOPODE® blocks Number of units placed: 641 Volume of concrete: 3653.7 m3

  • 18 m3 ACCROPODE® blocks Number of units placed: 399 Volume of concrete: 7182 m3

  • Number of units placed: 1040 Volume of concrete: 10835.7 m3

Country
Spain
Owner
Satocan S.A.
Date
2000 - 2001
Role of CLI
Technical assistance during unit fabrication and placing operations
Licence to use the ECOPODE® technique
Licence to use the ECOPODE® technique

You have a question ?

Specify your request ?