ECOPODE™ - Practical aspects fr Home Print
Formwork
•     Two symmetrical shells with bottom plates, assembled with quick assembly bolting system
•     The inside of the shells is architectured by means of appropriate coatings
•     ECOPODE™ moulds are specially made of fibre glass shells to obtain the rock-like appearance, backed with a steel spider frame mounted on wheels.

Casting
•     Min. area required to cast one unit of height H: 2H2
•     Min. compressive concrete strength recommended at stripping:
      10 MPa for all units sizes
•     Typical daily standard production rate: one unit per mould

Handling
•     Forklifting is effective for handling units up to 3 m3
•     Large units are handled with slings
•     Min. compressive concrete strength recommended for handling units:
      25 MPa for units less or equal to 8 m
      and 30 MPa for sizes above 8 m3

Storage
•     ECOPODE™ units are stored on one level placed close to each other, on ground with a sufficient bearing capacity.
•     Min. area required to store 10 units of height H: 7.1 H2

Placement
The positioning principle is based on a predetermined grid aimed at achieving optimum keying of the units. The grid spacings will match those of the smooth skin ACCROPODE™ II underneath.

Placement above water level is carried out visually or using GPS in order to obtain the proper packing.

Placement rates

                              Average placing time per unit (using cable cranes)

1.0 m3 £ Unit volume £ 3.0 m3

6 to 8 mins

4.0 m3 £ Unit volume £ 8.0 m3

10 to 12 mins

8.0 m3 £ Unit volume £ 11.0 m3

12 to 15 mins

NB: Higher rates can be obtained using hydraulic placing equipment with small size units
images


 NEWS
 FAQ
 SERVICES
 CONTACTS
 DOWNLOADS
 HATCHING
 CALCULATION
 BIBLIOGRAPHY





Work in progress

           Al Duqum Port

   More details


Work in progress

  Marchica Inlet 

  More details

 Home   FAQ   Legal aspects   Contacts   Downloads   Legal statements 
Agence kineka   -   Technologie Micrologiciel™