Submitted by maxime on
Innovation & services
CLI expertise

Two POSIBLOC™ systems

Posibloc

Two POSIBLOC™ systems have been ordered by China Harbour Engineering Company (CHEC) for the Karachi port expansion site. The first one has been delivered and has successfully passed the dry calibration tests. Tolerances recorded are within the 15cm allowance, complying with CLI recommendations. Underwater placement with this tool is scheduled to soon start after the monsoon. The second system is to be delivered in the near future.

(Archive footage, site of Al Duqum in Oman).